Measured, and slow
Commercial solar could only access VEU incentives through project-based M&V activities, certificates created after measuring actual site savings over time.
Activity 47 unlocks upfront VEEC incentives for eligible Victorian commercial and industrial solar installations. Deemed upfront, not measured over time. GreenDeal takes care of the certificate process, helping you get paid faster.
WHAT'S NEW
Before Activity 47 was introduced, commercial solar projects in Victoria could only generate VEECs through the Measurement and Verification method, with incentives based on measured energy savings over time. Activity 47 changed that by introducing an upfront, deemed incentive pathway for eligible 30–200 kW commercial and industrial solar systems.
Commercial solar could only access VEU incentives through project-based M&V activities, certificates created after measuring actual site savings over time.
Eligible 30–200kW systems now create VEECs as a deemed activity, calculated upfront from system size, without waiting on a measurement period.
HOW IT WORKS
GreenDeal manages the certificate process end to end, as your accredited person under the VEU program.
System is grid-connected, between 30kW and 200kW, and uses CEC-approved panels and inverters at a Victorian commercial or industrial site.
Create jobs in GreenDeal, and lodge the job through GreenDeal as your accredited person once installation starts.
VEECs are created based on the deemed calculation for the system. Once approved, payment follows GreenDeal's fast approval, faster payment process.
WHO IT'S FOR
That sizing suits a wide range of commercial and industrial sites across Victoria.
Manufacturing & processing sites

Distribution & logistics centres

Commercial office buildings

Education & training facilities

Clinics, aged care & medical

Shopping centres & mixed sites

ELIGIBILITY
Every condition below needs to be met before certificates can be created.
The solar PV system must be grid-connected.
Systems outside this range aren't eligible under Activity 47.
The system must be installed at a commercial or industrial premises in VIC.
Only one VEEC can be created per National Metering Identifier (NMI) under this activity.
AT A GLANCE
Activity 47 incentives can be stacked with federal STCs for eligible capacity, so a single project may draw on both schemes. GreenDeal can confirm the combined position for your site.
Indicative summary only. Final eligibility, calculation methods, and certificate values are subject to the published VEU Specifications (Activity 47) and Essential Services Commission requirements. Talk to your GreenDeal account manager for project-specific figures.