NSW PDRS Expands Battery Incentives

From 1 September 2026, three new activities — BESS3, BESS4 & BESS5 — significantly expand battery incentives across New South Wales. Apartments, commercial premises and large industrial facilities can now access incentives that were previously unavailable.

BESS3Apartment Batteries
BESS4Commercial Batteries
BESS5Large C&I Batteries

WHAT'S NEW

Three new activities,one bigger opportunity

The new activities extend the existing PDRS battery incentives beyond traditional residential houses. Together with the Federal Battery STC program, eligible systems may now receive substantial combined incentives where both schemes apply.

Whether you're a property developer, strata manager, commercial energy user or solar retailer, these activities create opportunities to reduce installation costs while supporting a more reliable electricity network.

THE ACTIVITIES

BESS3 · BESS4 · BESS5

BESS3

Apartment Batteries

Shared battery systems in residential apartment buildings (Class 2, or a part classified as Class 2). The building must generally contain at least four residential dwellings.

Apartment buildingsClass 2 premises4+ dwellingsShared systems
$1,000Min co-payment
OutdoorInstall location
BESS4

Commercial Batteries

Battery installations for small and medium businesses. Indoor and outdoor installs allowed (subject to safety), and capacity may be added to an existing system.

WarehousesOfficesRetailFarmsSchoolsMedicalHospitality
$5,000Min co-payment
Indoor / outdoorInstall location
BESS5

Large C&I Batteries

Large-scale behind-the-meter systems from 200 kWh up to 30 MWh (capped at 10 MWh) — bridging the gap between commercial batteries and utility-scale storage.

ManufacturingDistributionShopping centresHospitalsUniversitiesIndustrial
200kWh–30MWhCapacity range
BTMBehind the meter

AT A GLANCE

BESS3 vs BESS4 vs BESS5

Compare the three new PDRS battery activities side by side to find the right fit for your project.

BESS3ApartmentsBESS4CommercialBESS5Large C&I
Best forResidential apartmentsSmall & medium businessIndustrial & large sites
Building typeClass 2, 4+ dwellingsNon-residential, not a data centerCommercial / industrial
Battery capacityShared apartment systemSmall–medium scale200 kWh – 30 MWh (cap 10 MWh)
Install locationOutdoorIndoor & outdoorIndoor & outdoor
Min co-payment$1,000 (ex GST)$5,000 (ex GST)Under consultation
Warranty10 yrs · 70% retained10 yrs · 70% retainedPer scheme rules
Start date1 Sep 20261 Sep 20261 Sep 2026

Indicative summary only. Final eligibility and calculation methods are subject to the published PDRS rules and NSW Government requirements.

HIGHER INCENTIVES

Install solar + battery together

Both BESS3 and BESS4 provide higher incentive rates when the battery is installed together with new solar panels. Planning both systems together can significantly improve the total incentive available.

Higher incentive rates apply when the battery is installed together with new solar panels.

BESS3
1.41With New Panels
:
1No New Panels
BESS4
1.49With New Panels
:
1No New Panels

Within 90 days

The battery must be installed within 90 days of the new solar panels being installed to qualify for the higher calculation.

1:4 solar ratio (BESS4)

For BESS4, the new solar PV capacity must be at least one-quarter of the battery's usable capacity.

STACK THE SCHEMES

Stackable with Federal STCs

For eligible battery sizes, installers may also access the Federal Small-scale Technology Certificate (STC) incentive — the Cheaper Home Batteries Program — on top of PDRS.

The largest combined incentives are generally achieved with batteries up to 100 kWh nominal capacity (CEC), while larger batteries continue to receive PDRS incentives only.

BEFORE YOU PLAN

Important eligibility requirements

Ensure the system satisfies all PDRS requirements. Meeting every condition is essential before certificates can be created.

Installed in NSW

The battery must be installed within New South Wales.

10-year warranty

Battery and inverter must generally carry a minimum 10-year warranty with at least 70% retained usable capacity after 10 years.

Inverter output

Minimum battery inverter output is 1/6 of the battery's usable capacity (PDRS).

VPP-capable

The battery must be VPP-capable where required under the scheme.

Minimum co-payments

BESS3: $1,000 · BESS4: $5,000 (GST not inclusive).

Equipment & install rules

The battery must meet all PDRS equipment and installation requirements.

How GreenDeal can help

Talk to a GreenDeal account manager about BESS3, BESS4 and BESS5 for your project.

By submitting you agree to be contacted by GreenDeal about your enquiry.

By clicking "Accept All Cookies", you agree to the storing of cookies on your device to enhance site navigation, analyze site usage, and assist in our marketing efforts. Further information about our use of cookies and similar technologies can be found in our cookie policy .

Copyright ©2026, GreenDeal. All Rights Reserved